This 3 bath/3bed remodel in San Francisco is currently underway. The existing load bearing wall at the current kitchen will be removed and replaced with a steel header to open up the space. In addition to a seismic upgrade, a western-facing master bath will be added to the top level. Anticipated date of completion: Summer 2020